Welcome to Gaps Water Treatment learn more

Fast delivery starting from £9.00 Learn more

Competitive pricing on Spectrum Filter range learn more

  • Standard delivery

    Delivery within 2-3 working days

  • Order by 3pm

    Orders processed same day

  • Easy returns

    Hassle free returns policy

  • Live Support

    Mon - Fri (9am to 4pm)

Fleck BR61837 Piston and Seal Kit Assembly Down Flow 5800

SKU: 0401180004
£101.17
Tax included Shipping calculated at checkout.


Fleck BR61837 Piston and Seal Kit Assembly Down Flow for 5800

Maintain the efficiency of your water treatment system with the Fleck BR61837 Piston and Seal Kit Assembly Down Flow, designed for the Fleck 5800 model. This high-quality kit, manufactured by Pentair, includes replacement pistons, seals, and spacers to ensure your system operates smoothly and prevents leaks. Trust GAPS Water Treatment, your reliable vendor, for genuine Fleck and Pentair parts that guarantee optimal performance and longevity.

Key Features:

  • Compatible with Fleck 5800 model
  • Includes replacement pistons, seals, and spacers
  • Manufactured by Pentair for superior quality
  • Prevents leaks and ensures smooth operation
  • Available from GAPS Water Treatment

Installation Tips

  1. Preparation:

    • Ensure you have all necessary tools: screwdriver, pliers, and a clean cloth.
    • Turn off the water supply to the system and relieve any pressure by running a faucet.
  2. Disassembly:

    • Remove the control valve cover to access the internal components.
    • Carefully disconnect the power supply to avoid any electrical hazards.
  3. Removing Old Components:

    • Locate the existing piston and seal assembly.
    • Gently pull out the old piston and seals, taking care not to damage the surrounding parts.
  4. Cleaning:

    • Clean the valve body and surrounding areas to remove any debris or build up.
    • Inspect the valve body for any signs of wear or damage.
  5. Installing New Components:

    • Lubricate the new seals with a silicone-based lubricant to ensure a smooth fit.
    • Insert the new piston and seals into the valve body, ensuring they are properly seated.
  6. Reassembly:

    • Reattach the control valve cover and reconnect the power supply.
    • Turn on the water supply and check for any leaks.
  7. Testing:

    • Run a manual regeneration cycle to ensure the new components are functioning correctly.
    • Monitor the system for a few days to ensure there are no issues.

For detailed instructions, you can refer to the Fleck 5800 Service Manual

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Fleck BR61837 Piston and Seal Kit Assembly Down Flow 5800 | GAPS Water Treatment

Fleck BR61837 Piston and Seal Kit Assembly Down Flow 5800

£101.17

Fleck BR61837 Piston and Seal Kit Assembly Down Flow for 5800

Maintain the efficiency of your water treatment system with the Fleck BR61837 Piston and Seal Kit Assembly Down Flow, designed for the Fleck 5800 model. This high-quality kit, manufactured by Pentair, includes replacement pistons, seals, and spacers to ensure your system operates smoothly and prevents leaks. Trust GAPS Water Treatment, your reliable vendor, for genuine Fleck and Pentair parts that guarantee optimal performance and longevity.

Key Features:

Installation Tips

  1. Preparation:

    • Ensure you have all necessary tools: screwdriver, pliers, and a clean cloth.
    • Turn off the water supply to the system and relieve any pressure by running a faucet.
  2. Disassembly:

    • Remove the control valve cover to access the internal components.
    • Carefully disconnect the power supply to avoid any electrical hazards.
  3. Removing Old Components:

    • Locate the existing piston and seal assembly.
    • Gently pull out the old piston and seals, taking care not to damage the surrounding parts.
  4. Cleaning:

    • Clean the valve body and surrounding areas to remove any debris or build up.
    • Inspect the valve body for any signs of wear or damage.
  5. Installing New Components:

    • Lubricate the new seals with a silicone-based lubricant to ensure a smooth fit.
    • Insert the new piston and seals into the valve body, ensuring they are properly seated.
  6. Reassembly:

    • Reattach the control valve cover and reconnect the power supply.
    • Turn on the water supply and check for any leaks.
  7. Testing:

    • Run a manual regeneration cycle to ensure the new components are functioning correctly.
    • Monitor the system for a few days to ensure there are no issues.

For detailed instructions, you can refer to the Fleck 5800 Service Manual

View product